Three parts of mine design: feasibility study, preliminary design, and construction plan
The key to mine design is all must be established on the basis of detailed investigation, and therefore Xinhai Mine Design Institute will firstly take a comprehensive field study to the mine of clients including the crude ore for dressing plant, site, water, electricity, traffic, geography, etc.
These investigation contents need the cooperation of geology, mining, ore dressing, smelting, machinery, civil engineering, electric power and other departments.
Xinhai Design Institute has Grade B design qualification in metallurgical industry and has a talent pipeline of 80 specialists in 16 areas, including geology, mining, mining machine, shaft construction, mineral processing, civil engineering, electricity, water supply and drainage, heating, ventilation, tailings, pipeline, automation, steel structure, technical economy and cost estimation.Xinhai also provides mine engineering design and consultancy for ferrous and nonferrous metal mines, gold mines, nonmetal mines and chemical mines with annual capacities ranging from hundreds of tons to millions of tons.
With professional SolidWorks 3D design software and PDM design management system, Xinhai can provide mobile mineral processing plant design; 3D mineral processing plant design; production line design of modular steel structure processing plant, that is, to design and manufacture the ore bin, water pond, platform, equipment support, hopper, chute and other reinforced concrete components into modular steel structure type. It is very flexible in installation at the mine site, which can reduce the amount of civil work, shorten the construction time, decrease the investment, and be easy to disassemble and move.
Xinhai can provide the design in accordance with not only Chinese standards, but also Australian JORC standard, Valmin specification and Canada NI43-101 standard. Xinhai has established strategic partnerships with mining design consulting companies in Australia and Canada, with complementary advantages. For the “E” part in EPC project, the scheme is determined by both parties, the specific work is undertaken by Xinhai, and the design review and qualification are handled by Xinhai partners in Australia or Canada. For some countries and regions in Africa, South America, Central Asia and Southeast Asia, Xinhai can conduct the design according to the standards and codes of China, Australia, Canada and local countries.
No mines in the world are the same, and Xinhai will always provide customized design scheme for your mine.Comprehensive site investigation: the raw ore, ore supply, plant site, water and electricity, transportation, geography, etc.Feasibility plan: 14 departments of Mine Design and Research Institute cooperate with each other to collect the data, study the feasibility, determine the feasibility plan and compose the Feasibility Study Report.Construction drawings of plant: after the preliminary design of some construction drawings is approved, Mine Design and Research Institute will begin to design the construction drawings according to design scheme, and at the same time, it will introduce the design and hand over the precautions, strict specifications, important contents and other details to construction commanders at the construction site.
In the feasibility study stage, first, Mine Design Institute and the client need to sign the entrustment agreement. After the two sides reached an agreement, Xinhai Mine Design Institute starts to establish a working group for work including planning, investigation, data collection, planning and optimization, project evaluation, "report" writing, and exchanging views with commissioned units to form a formal report.
In all the work of the working group to carry out, investigation, data collection and plan optimization are the most important bases for selecting plant construction scheme. For these important parts, the working group requires different professional division and cooperation, including:
Collecting "Geological General Survey and Design", "Geological Survey (detailed survey) Report" or "Reserve Verification Report" and the approved documents of qualified geological prospecting departments.
Information collection: (1) Opinions and requirements of clients of mine construction; (2) For new mines, collecting the existing layout maps of exploration engineering; for technical improvement mines, collecting the existing transit system information; (3) Detailed knowledge of mining area terrain and surrounding environmental conditions; (4) Design information of the preliminary design stage of mine.
According to this collected information, mining experts design or optimize the mining method, equipment, ventilation system and so on, and come up with a feasible plan for mining section.
Collecting the data on lifting, transportation, air compression, drainage and ventilation, then judging the status quo of existing equipment of the mine or the quantity and specifications of equipment required of new mine, coming up with the feasible plans for improvement, usage and procurement of mine equipment.
Information collection: (1) Investigation of field geomorphic condition; (2) Collecting hydrological data and "geotechnical engineering investigation report"; (3) To know the local architectural style, structure, waterproofing, thermal insulation and other building practices; (4) Investigation of material sources, transportation and price of the local building including gravel, brick, lumber, steel, cement, etc. Based on these data, Civil Engineering Department explains the form of building construction for customers in the report and determines the main project structure and the main construction method.
For new mine, information collection: (1) The electricity supply environment of mine; (2) Topography and geomorphology between ore area and current source; (3) The basic condition of transformer substation; (4) The requirements of local power supply department, such as power, power supply mode, the starting mode of large electrical equipment; (5) The local requirements of lightning protection and grounding; (6) The condition of external communication and local communication. For improvement and extension mine, information collection: (1) Mine power supply existing situation; (2) The general situation of transformer substation; (3) The setting situation of existing safety source; (4) Existing communication situation.
After collecting information, electrical power specialty comes up with feasibility program for electric power system of a new mine or improvement & extension mine.
Information collection for new mine: "Ore beneficiability test report", plant topographic map (1:500 1:1000), the water, electricity, tailings dam, environmental protection requirements, the construction standards, the amount of investment and building an opinion of owners. Information collection for extension mine: the current project scale, ore beneficiability test report, the present production process, operating parameters, material consumption, existing specification and production capacity of equipment, general layout plans of the existing processing plant, equipment layout plans of a workshop, production problems. Basing on these data, mineral dressing specialty comes up with a feasible solution for new or renovation and expansion mineral dressing plant.
In addition, the specialties needing to collect information include general plan transportation (geographic and topographic data; social economy; weather; flood; engineering geology and hydrology geology; traffic; environmental protection), tailings (tailings information; hydrometeor), drainage, HVAC, etc.
By the data collection and the feasibility study from the various specialties, Mine Design Institute ultimately determines a feasible scheme for the plant construction and writes the "Feasibility study report" submitted to the relevant departments.
"Feasibility study report" with strict requirements on qualification, ability, experience, professional title of a writer is an important basis for evaluation EIA and safety unit (some projects must take soil and water conservation and land reclamation evaluation).
Clients would have a general understanding of the dressing plant scale, investment scale, profit and other key factors by "Feasibility study report".
After "Feasibility study report" is approved, Mine Design Institute starts preliminary design and comes up with the design of dressing plant construction. Design mainly involves dressing, general layout, electric power, communication, civil engineering, environmental protection, water supply and drainage, tailings, safety and fire protection, investment estimates, economic benefit. For the improvement and extension enterprises, the preliminary design will illustrate the status, characteristics, plant, main problems, utilization of main buildings and equipment.
Xinhai Mine Design Institute has many engineers who can design different types of dressing plants (less investment, quick capital return or easy management) according to clients’ requirements. what's more, the design cost is lower than the national standard.
After the completion of the preliminary design, Design Institute experts will gather all content to form the detailed “Preliminary design report " submitted to the competent department of Mine Design Institute.
When the preliminary design is approved, Mine Design Institute starts to design construction drawings. Every aspect of dressing plant needs a lot of construction drawings (generally, over 100 working drawings), such as civil construction. Engineers of Xinhai Mining Institute are numerous with rich experience and drawing speed. When the working drawings is completed, the designers must hand the drawings over to construction commanding officers, especially, the notes, strict regulations and important content.
Xinhai Mine Design Institute is the first mineral processing design institute, with class B design qualification of metallurgical industry, which can undertake the design business of non-ferrous metals industry construction projects and support engineering without scale limitation.
Xinhai Mine Design Institute provides technical support for EPC, mainly responsible for the relevant problems of mine design and mine consulting. Over the past 20 years, hundreds of Xinhai EPC are completed successfully relying on the technical support of Mine Design Institute.
Xinhai Mine Design Institute owns over 200 professionals from various specialties including geology, mining, mineral machinery, ore dressing, smelting, civil engineering, electric power, general drawing, drainage, tailings, heating and ventilation, technical economy, budget, etc.
Mining Department usually carries out geological exploration and survey and provides mining method and equipment according to the opinion & requirement of clients, terrain, landform and the surrounding environment of the mining area.
In engineering consulting, Mining Department provides a better mining method and outline of mining equipment list according to the actual situation and their rich experience. They would estimate the investment and economic benefits of mining part. In addition, they also solve the problems of mining for clients.
The Electric Power Department mainly solves the problem of power and lighting of mines and factory, including power load, power supply source, and power supply system.
In the engineering consulting, the Electric Power Department will first have a detailed understanding about power condition and plant, and then provide a general electric equipment list according to the actual situation, finally providing the cost quotation of factory power part.
Cables of electric power system
Motor starting cabinet
Electric power system
Civil Engineering Department is responsible for the design and construction of mine workshop, office building, warehouse, process matching workshop etc.
Civil Engineering Department should understand the local meteorological and seismic condition, and designs supporting facilities according to the process design of the Mineral Dressing Research Institute and plant construction site, and finally, gives general quotation with consideration of materials and size of buildings.
Civil work
Civil construction