case banner

Xinhai Cases

Home Home > Case
Unfold Retract

Guinea 6,000t/d Gold Mineral Processing Plant

Ore: Gold

Capacity: 3000-6000TPD

Process: Slurry conditioning of raw ore - grinding and classification - gravity concentration - cyanide leaching - desorption electrolysis.

Sudan 700t/d Rock Gold Mineral Processing Plant

Ore: Gold

Capacity: 300-1000TPD

Process: All-slime cyanidation process

Zimbabwe 700t/d Gold Mineral Processing Plant

Ore: Gold

Capacity: 300-1000TPD

Process: One-stage grinding -two-stage closed-circuit grinding and classification - gravity concentration -cyanidation - desorption electrolysis - smelting - tailings dewatering

Tanzania 1,200t/d Gold Mineral Processing Plant

Ore: Gold

Capacity: 1000-3000TPD

Process: All-slime cyanidation process

Morocco 500t/d Silver Mineral Processing Plant

Ore: Silver

Capacity: 300-1000TPD

Process: Two and a half stage close-circuit crushing - two-stage grinding - flotation (a roughing, three scavenging and two cleaning) - two-stage dewatering

Tanzania 600t/d Gold Mineral Processing Plant

Ore: Gold

Capacity: 300-1000TPD

Process: Two-stage closed-circuit crushing and screening - two-stage closed-circuit grinding - CIP - tailings dewatering by filter press - desorption electrolysis-smelting

Tanzania 150t/d Gold Mineral Processing Plant

Ore: Gold

Capacity: <300TPD

Process: Two closed-circuit crushing - two closed-circuit grinding, classification - jigging - gold extraction by cyanidation - desorption electrolysis - smelting

Sudan 300t/d Gold Mineral Processing Plant

Ore: Gold

Capacity: 300-1000TPD

Process: Pre-screening - one-stage closed-circuit grinding and classification - thickening - cyanide leaching - desorption electrolysis - smelting - tailings dewatering by filter press

Uganda 720t/d Phosphorus Mineral Processing Plant

Ore: Phosphorite

Capacity: 300-1000TPD

Process: Desliming - one-stage closed-circuit grinding - direct flotation process of one-stage roughing, one-stage scavenging and two-stage concentration - concentrates and tailings dewatering

Burundi 1200t/d Gold Mineral Processing Plant

Ore: Gold

Capacity: 1000-3000TPD

Process: Gold ore heavy separation - cyanation process

Sudan 240 t/d Gold Mineral Processing Plant

Ore: Gold

Capacity: <300TPD

Process: Two stage of open-circuit crushing + one stage closed-circuit grinding + multi-stage heavy separation.

Ghana 1000t/d Gold Mineral Processing Plant

Ore: Gold

Capacity: 1000-3000TPD

Process: Gravity separation and carbon slurry process

Mali 150 t/d Gold Mineral Processing Plant

Ore: Gold

Capacity: <300TPD

Process: Screening and removing impurities-one stage wet grinding-CIL cyanide leaching-desorption electrolysis process

Tanzania 25t/d Gold Gravity Separation Plant

Ore: Gold

Capacity: <300TPD

Process: Gold Gravity Separation

Tanzania 100t/d Gold Tailings Processing Plant

Ore: Tailings

Capacity: <300TPD

Process: A process for recovering gold after grinding using all-slime cyanidation.

Namibia 1,100t/d Copper-Lead Mineral Processing Plant

Ore: Gold

Capacity: <300TPD

Process: Two roughing, two scavenging and three concentration flotation process.

Zimbabwe 500t/d Gold CIP Plant

Ore: Gold

Capacity: 300-1000TPD

Process:

South Africa 3000t/d Chromite Flotation Processing Plant

Ore: Gold

Capacity: 3000TPD

Process: Two-stage coarse - one-stage scavenging - three-stage concentrating flotation process.

Zimbabwe 500t/d Gold Processing Plant

Ore: Gold

Capacity: 300-1000TPD

Process: Two-stage open circuit crushing - wet grinding - gravity separation process

Zimbabwe 2400t/d Sand Chrome Processing Plant

Ore: Gold

Capacity: 1000-3000TPD

Process: Washing - gravity separation process.

Gold test project in Guinea

Ore: Gold

Capacity: <300TPD

Process: Gravity concentration + gravity tailings cyanide leaching process

Gold processing test project in Congo

Ore: Gold

Capacity: <300TPD

Process: Raw ore leaching process or raw ore filter heap leaching process

Processing Test for Gold Deposits in Congo

Ore: Gold

Capacity: <300TPD

Process: Gravity separation + flotation + flotation gold concentrate cyanide leaching process

Gold Processing Test Project in Burkina Faso

Ore: Gold

Capacity: <300TPD

Process: Process flow of gravity concentration + gravity tailings cyanide leaching

Gold ore Processing test in Guinea - Ningbo

Ore: Gold

Capacity: <300TPD

Process: The gravity separation-leaching process

Gold Ore Processing Test Project in Africa

Ore: Gold

Capacity: <300TPD

Process:

MORE

xinhai
right-bg
MESSAGE
MESSAGE
top