case banner
Home Home > Case > Tanzania 100t/d Gold Tailings Processing Plant
CASE

Tanzania 100t/d Gold Tailings Processing Plant

According to the general contract of the engineering project signed by the two parties, Xinhai provided customers with EPC+M+O. The scope of design work includes: general drawing, mineral processing, civil engineering, power, etc.

Xinhai Solution

01

A process for recovering gold after grinding using all-slime cyanidation.

Main Equipment

Desorption Electrolysis System
Desorption Electrolysis System

Desorption electrolysis system as gold extraction equipment obtains gold mud from carbon by desorption and electrowinning

High Efficiency Agitation Tank
High-Efficiency Agitation Tank

An agitation equipment which forces the slurry to circulate up and down.

Press-Filter
Press Filter

A dewatering equipment that uses the slurry pump pressure to make liquid filter cloth come out, including chamber press filter and plate press filter

Project Result

The stable operation of the concentrator and the reliable equipment quality has made the beneficiation indicators and economic benefits meet the expectation, which has been strongly recognized by the customer.

Related CASES

Related news

xinhai
right-bg
MESSAGE
MESSAGE
top