This project was reconstruction project. It was South Africa 8000t/d platinum and 3000t/d chromite flotation system. The mineral processing flow was two-stage coarse - one-stage scavenging - three-stage concentrating flotation process.
The raw material of this project was the 3000t/d tailing slurry of 8000t/d platinum processing plant through strong magnetic concentrating scavenging.
The raw ore slurry was pumped to the two concentrating hydrocyclone in thickening workshop of 3000t/d chromite flotation system by strong magnetic concentrating scavenging concentrate pump from the magnetic separation workshop.
After thickening in hydrocyclone, the downflow flew to the mining box of agitation tank in flotation workshop. The overflow flew to tilted plate thickener through mining box.The downflow of thickener was sent to the slurry agitation in flotation workshop through downflow pump.
The overflow of thickener flew to the original thickener. In flotation workshop, chromite concentrates were separated by two-stage rough - one-stage scavenging - three-stage concentrating flotation. The final chromite product was obtained through dewatering of the original belt filter.
A slurry pump for conveying pulp with concentration below 65%.
A wet permanent magnetic separator for separating strong magnetic minerals
A hydrocyclone with involute feeding
A slurry gravity thickener designed with tilted plate in sedimentation area
Please write your message here! We will send detailed technical info and quotation to you as soon as possible!
Committed to providing optimal solutions for your mine!