0086 15311826765
Flotation
Gravity Separation
Magnetic Equipment
Gold Extraction
Washing Equipment
Agitation Equipment
Feeding
Transmission
Iron Removal
Automatic Control
Pumps
Valves
Hydrocyclone
Zimbabwe 500tpd gold processing project is Xinhai mineral processing EPC+M+O project. The mineral processing plant design includes the design of construction drawing for external processing of ore, including mineral processing, electric power, civil engineering, and general drawing.
Two-stage open circuit crushing - wet grinding - gravity separation process.
Jaw crusher was used for the first stage of crushing, and hammer crusher for the second stage. The crushing product is stored in the steel buffer bin through belt conveyor.
Then after the wet grinding of gold mill, the product separated in centrifugal concentrator.
The tailings pumped to thickener through slurry pump, and then dewatering in thickener.
Please write your message here! We will send detail technical info and quotation to you as soon as possible!
Committed to providing optimal solutions for your mine!