The Sudan 7000t/d gold mineral processing plant was an EPC+M+O project. The ore of this project contained 2.97g/t of gold, most of which were earthy minerals with particle size below 2mm. A small part of the ore was blocky minerals, and the maximum particle size was 70mm.
One-stage open-circuit crushing.
One-stage closed-circuit grinding.
CIP-desorption electrolysis-smelting.
Press filtering and tailings dry stacking.