0086 13810327080
It was a 500t/d gold CIP processing plant.
Theraw material of the concentrator was gold heap leaching tailings. The rawmaterials were fed into the raw ore bin by the loader, and the belt conveyorwas set under the bin. The raw materials were fed into the belt and transferredto the ball mill in the zone for grinding.
Theball mill, pump and classification cyclone formed a closed-circuit grindingsystem. The overflow of the classification cyclone flowed to the thickener forconcentration. After that, the ore slurry entered the leaching operation.
Theleached gold was adsorbed by the activated carbon to obtain gold-loaded carbon.Then, the gold-loaded carbon was desorbed and electrolyzed to obtain the goldmud.
Finally,the gold mud was smelted to obtain gold ingots. The tailings were fed into thefilter press, the generated backwater was returned to production and the filtercake was transported away by car.
Please write your message here! We will send detailed technical info and quotation to you as soon as possible!
Committed to providing optimal solutions for your mine!