Project Overview
Xinhai Tanzania 1200tpd gold mineral processing project is located in Africa,thus has big differences from domestic one in project management, construction technology,resource supply and work coordination.
-
Pictured above is the grinding and thickening panorama of the Xinhai Tanzania 1200tpd gold mineral process plant.
Pictured right is a group photo from project site of Xinhai employees with the customer.
-
Main Work of the Project:
Mainly includes thickening,cyaninding and desorption electrosis parts.Main work of the installation and commissioning includes:
1.Install the equipment such as thickening, cyaniding, desorption electrosis system.
2.Install the pipelines and operation platforms (exclude tailings pipelines of outdoors);
3.The electric power, water supply and drainage.(exclude water supply from water source)
Civil Construction
Civil construction mainly includes factory building and equipment foundation construction.after the foundation construction work of thickening and leaching tank, the installation and construction of pipeline and electric instrument also should be finished.