  • Xinjiang 300tpd Gold Processing Plant

    Ore: Gold

    Capacity: 300-1000TPD

    Process: Two stage closed-circuit crushing- Two stage closed-circuit grinding-All-slime cyanidation-Tailings dewatering

  • Yunnan 1,000t/d Copper Mineral Processing Plant

    Ore: Copper

    Capacity: 1000-3000TPD

    Process: Two stages and one closed circuit crushing and screening-one stage of closed circuit grinding-copper flotation (one roughing, three scavenging and three concentration)-sulfur flotation (one roughing, two scavenging and three concentration)-concentrate dehydration-tailings dehydration process.

  • Hebei Chengde 300t/d Gold Processing Plant Project

    Ore: Gold

    Capacity: 300-1000TPD

    Process: Two-stage semi-closed circuit crushing and screening- two-stage closed circuit grinding and classifying- gravity separation-flotation separation-concentrate tailings dewatering process.

  • Hebei 400t/d Gold Tailings Dry Stacking Project

    Ore: Tailings

    Capacity: 300-1000TPD

    Process: Gold Tailings Dry Stacking

  • Qinghai 450tpd Gold Processing Plant Project

    Ore: Gold

    Capacity: <300TPD

    Process: Two-stage closed-circuit crushing--stage grinding--two roughing, three scavenging, and three cleaning--concentrate dewatering process.

  • Hebei 480t/d Silicon Processing Plant

    Ore: Quartz Sand

    Capacity: 300-1000TPD

    Process: One-stage open-circuit self-grinding + one-stage closed-circuit grinding and classification + two-stage magnetic separation + one-stagedesliming + four-stage scrubbing - desliming + one-stage closed-circuitre grinding+ silicon powder dewatering + secondary fine powder dewatering process.

  • Shandong Qingdao 350t/d Gold Mineral Processing Plant

    Ore: Gold

    Capacity: 300-1000TPD

    Process: Two stages, one closed circuit crushing and screening-one stage of closed circuit grinding-one roughing, two scavenging, and two fine flotation processes-two stages of mechanized dehydration process.

  • Chongli 300t/d Gold Mineral Processing Plant in Zhangjiakou, Hebei

    Ore: Gold

    Capacity: 300-1000TPD

    Process: Two stages and one closed circuit crushing and screening + one stage closed circuit grinding + flotation (one roughing, two scavenging and two concentration) + concentrate dewatering.