0086 13810327080
Ore: Gold
Capacity: 300-1000TPD
Process: Two stage closed-circuit crushing- Two stage closed-circuit grinding-All-slime cyanidation-Tailings dewatering
Ore: Copper
Capacity: 1000-3000TPD
Process: Two stages and one closed circuit crushing and screening-one stage of closed circuit grinding-copper flotation (one roughing, three scavenging and three concentration)-sulfur flotation (one roughing, two scavenging and three concentration)-concentrate dehydration-tailings dehydration process.
Ore: Gold
Capacity: 300-1000TPD
Process: Two-stage semi-closed circuit crushing and screening- two-stage closed circuit grinding and classifying- gravity separation-flotation separation-concentrate tailings dewatering process.
Ore: Tailings
Capacity: 300-1000TPD
Process: Gold Tailings Dry Stacking
Ore: Gold
Capacity: <300TPD
Process: Two-stage closed-circuit crushing--stage grinding--two roughing, three scavenging, and three cleaning--concentrate dewatering process.
Ore: Quartz Sand
Capacity: 300-1000TPD
Process: One-stage open-circuit self-grinding + one-stage closed-circuit grinding and classification + two-stage magnetic separation + one-stagedesliming + four-stage scrubbing - desliming + one-stage closed-circuitre grinding+ silicon powder dewatering + secondary fine powder dewatering process.
Ore: Gold
Capacity: 300-1000TPD
Process: Two stages, one closed circuit crushing and screening-one stage of closed circuit grinding-one roughing, two scavenging, and two fine flotation processes-two stages of mechanized dehydration process.
Ore: Gold
Capacity: 300-1000TPD
Process: Two stages and one closed circuit crushing and screening + one stage closed circuit grinding + flotation (one roughing, two scavenging and two concentration) + concentrate dewatering.