Mongolia 1,000t/d Gold Mineral Processing Plant
pending update

Hebei Chengde 300t/d Gold Processing Plant Project

The metal minerals in the ore included pyrite, chalcopyrite, limonite, hematite, etc. Gangue minerals included quartz and calcite. The raw ore contained granular gold. The upper part of the mine was oxidized ore, and the lower part was sulfide ore.

XINHAI SOLUTION

MAIN EQUIPMENT

PROJECT RESULT

The raw ore was ground with a fineness of -200 mesh accounted for 70.1%. The gold grade reached 335.4g/t-348.7g/t and the gold recovery rate of heavy sand 1 was 53.51%-56.31% through gravity separation by shake table. Heavy sand 1 contained granular gold with a gold grade of 30.2g/t-43.51g/t, and heavy sand 2 can be obtained with a gold recovery rate of 9.0%-10.41%. The flotation gold ore with a gold grade of 24.26g/t-29.38g/t and recovery rate of 25.85%-29.05% could be obtained from the tailings of gravity separation by flotation. The recovery rate of gold in the beneficiation test of gravity separation and flotation process reached 91.56%-92.57%.

SUCCESSFUL CASES

RELATED NEWS

Contact Us

To find out more about our products and solutions, please fill out the form below and one of our experts will get back to you shortly.

  • Please fill in the Material

    • Gold
    • Silver
    • Copper
    • Iron
    • Lead
    • Zinc
    • Molybdenum
    • Chrome
    • Manganese
    • Nickel
    • Tin
    • Wolfram
    • Antimony
    • Barite
    • Fluorite
    • Feldspar
    • Graphite
    • Zircon
    • Lithium
    • Quartz
    • Others
xinhai