PROJECT RESULT
Bench testwork defined the separation route and delivered design indices of 98.06% CaF₂ and 63.58% PbS in the respective concentrates, with recoveries of 68.3% for fluorite and 96.4% for galena. The technical proposal was issued in June 2025 and the equipment contract was signed in August 2025; shipments began in January 2026 and installation guidance is scheduled to follow. Delivered under CE and European standards, the plant is designed to keep all process water in circulation and send dry tailings to backfill.