PROJECT RESULT
The tailings facility concept design was completed in May 2024, with the full scheme delivered in March 2025. Rated as a Class IV facility, the dam provides 7.786 million m³ of total storage and about 5.84 million m³ of usable capacity, serving an estimated 8.7 years of operation. Stability analyses returned safety factors above the specified minimum under normal, flood and special conditions, and the flake-protecting graphite flowsheet was developed from detailed condition testwork on ore grading 5.67% recoverable fixed carbon.