0086 13810327080
Ore: Gold
Capacity: <300TPD
Process: Two-stage open-circuit crushing--one-stage closed-circuit grinding--flotation (one roughing, three scavenging and two cleaning) --concentrate dewatering --tailings dewatering.
Ore: Gold
Capacity: <300TPD
Process: Gold Mine Tailings Cyanide Removal Plant
Ore: Gold
Capacity: <300TPD
Process: Gold Gravity Separation
Ore: Lead-Zinc
Capacity: 300-1000TPD
Process: Differential flotation process (zinc inhibition first and lead flotation then).
Ore: Tailings
Capacity: <300TPD
Process: A process for recovering gold after grinding using all-slime cyanidation.
Ore: Gold
Capacity: <300TPD
Process: Two roughing, two scavenging and three concentration flotation process.
Ore: Gold
Capacity: 300-1000TPD
Process: All-slime cyanidation+ CIP process of flotation concentrate. The original 250tpd all-slime cyanidation system was retained, and the new 300tpd grinding and floating system are added. After the thickening, filtration and reagent removal, the flotation concentrate entered into the original 250tpd two-stage grinding mill for regrinding and then entered into the original cyanidation system.
Ore: Copper
Capacity: 3000-6000TPD
Process: Flotation process (one-stage roughing, two-stage scavenging and three-stage concentration).