  • Shandong 2,000t/d Molybdenum-Tungsten Mineral Processing Plant

    Ore: Molybdenum

    Capacity: 1000-3000TPD

    Process: One-stage open-circuit crushing - two-stage grinding and classification - prioritized flotation and separating tungsten from flotation tailings - tailings disposal

  • Mongolia 150t/d Tungsten Mineral Processing Plant

    Ore: Tungsten

    Capacity: <300TPD

    Process: Crushing - grinding, gravity separation - classification, gravity separation - tailings dry stacking

  • Uganda 720t/d Phosphorus Mineral Processing Plant

    Ore: Phosphorite

    Capacity: 300-1000TPD

    Process: Desliming - one-stage closed-circuit grinding - direct flotation process of one-stage roughing, one-stage scavenging and two-stage concentration - concentrates and tailings dewatering

  • Vietnam 800t/d Graphite Mineral Processing Plant

    Ore: Graphite

    Capacity: 300-1000TPD

    Process: Two-stage closed-circuit crushing - one-stage closed-circuit grinding and classification - flotation process of one-stage roughing, two-stage scavenging and ten-stage concentration

  • Hebei 400t/d Feldspar Mineral Processing Plant

    Ore: Feldspar

    Capacity: 300-1000TPD

    Process: Two-stage closed-circuit crushing and screening - one-stage closed-circuit grinding and classification - magnetic separation, desliming and indirect flotation - mechanical dewatering

  • Inner Mongolia 700t/d Fluorite Mineral Processing Plant

    Ore: Fluorite

    Capacity: 300-1000TPD

    Process: Two-stage closed-circuit crushing - one-stage closed-circuit grinding and classification - flotation process of one-stage roughing, one-stage scavenging and seven-stage concentration - concentrates and tailings dewatering - concentrates drying

  • Inner Mongolia 5,000tpd Silver and Polymetallic Mineral Processing Plant

    Ore: Multi-Metal

    Capacity: 3000-6000TPD

    Process: Two-stage continuous grinding - flotation - comprehensive concentrate regrinding – two-stage leaching and two-stage washing - zinc powder displacement process.

  • Inner Mongolia 2000TPD Molybdenum Mineral Processing Plant

    Ore: Molybdenum

    Capacity: 1000-3000TPD

    Process: Two stage one closed circuit crushing and screening-three stage closed circuit grinding-flotation (one roughing, two scavenging and seven cleaning + two fine scavenging) - concentrate dehydration process.